Friday, April 22, 2011

Updated to-do list!

An updated list of to-do items.
  1. Hook up electricity (Procure 30' of 8-3 wire)

  2. Steps up to front door (small porch

  3. Loft flooring installed (80sq ft carpet, pad and tack strips-37ft)

  4. Paint in kitchen touched up and second coat in bathroom

  5. Blinds for windows (found and installed)

  6. Find refrigerator

  7. Finish plumbing

  • behind shower

  • find water heater and install

  • plumb in kitchen sink (in and out)

  • find and install bathroom sink

  • black water “hole” and plumbing

  • water in

  • grey water collection container

  1. Kitchen counter and sink installed (obtain and install from Home Depot)

  2. Bathroom door (made and installed) (Timothy has a door)

  3. Bathroom vanity/shelf and trim (cedar or pine)

  4. Shower ceiling finished (finished plywood) (proper shower head)

  5. Trim in living area (cedar) (base, crown and windows)

  6. Trim in closet (cedar)

  7. Closet rod, shelf and curtain

  8. Finish kitchen cabinets

  9. Shelves on kitchen wall

  10. Two hanging lights in kitchen (purchased and installed)

  11. Caulk and paint (window trim and soffits)

  12. Front porch

  13. Kitchen island (plan and make)

No comments: