Hook up electricity (Procure 30' of 8-3 wire)
Steps up to front door (small porch
Loft flooring installed (80sq ft carpet, pad and tack strips-37ft)
Paint in kitchen touched up and second coat in bathroom
Blinds for windows (found and installed)
Find refrigerator
Finish plumbing
behind shower
find water heater and install
plumb in kitchen sink (in and out)
find and install bathroom sink
black water “hole” and plumbing
water in
grey water collection container
Kitchen counter and sink installed (obtain and install from Home Depot)
Bathroom door (made and installed) (Timothy has a door)
Bathroom vanity/shelf and trim (cedar or pine)
Shower ceiling finished (finished plywood) (proper shower head)
Trim in living area (cedar) (base, crown and windows)
Trim in closet (cedar)
Closet rod, shelf and curtain
Finish kitchen cabinets
Shelves on kitchen wall
Two hanging lights in kitchen (purchased and installed)
Caulk and paint (window trim and soffits)
Front porch
Kitchen island (plan and make)
No comments:
Post a Comment